Vertically integrated continuous delivery of an application
US9021458B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 25, 2014 |
| Grant date | Apr 28, 2015 |
| Priority date | — |
| Expiry date | Jun 25, 2034 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L67/34
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Embodiment are directed towards managing application delivery over a network. Change information that corresponds to changes to an application may be provided to a delivery pipeline. The change information may be verified in part based on a static analysis of the content of the change information, compiling, and unit testing. Reviewers may be notified to approve the change information. A version of the application that includes the change information may be generated. Acceptance testing may be performed that includes provisioning computing resources in an acceptance computing environment. And, deploying a version of application that includes the change information into the acceptance computing environment. If the acceptance testing passes, a shipping operation may be enabled pausing the delivery pipeline until an authorized user activates the shipping operation restarting the delivery pipeline and deploying the application to one or more computing environments.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.