Completing a multi-stage well
US9033041B2 · kind B2 · utility
42Cited by
65References
16Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Sep 13, 2011 |
| Grant date | May 19, 2015 |
| Priority date | — |
| Expiry date | Apr 12, 2033 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B2200/04
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A technique includes running a seat assembly on a conveyance line into a tubing string, which has previously been installed in a well. The seat assembly includes a seat, which is adapted to receive an untethered object. The technique includes attaching the seat assembly to the string at a location downhole in the well; receiving the object to create a fluid barrier; and diverting fluid using the fluid barrier.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.