Patent · US Active

Method for operating a combined cycle power plant

US9046037B2 · kind B2 · utility

5Cited by
5References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 14, 2012
Grant dateJun 2, 2015
Priority date
Expiry dateDec 14, 2032

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E20/16
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A method for operating a combined cycle power plant is disclosed, which has a gas turbine installation and a water-steam cycle connected to the gas turbine installation by a waste heat steam generator and has at least one steam turbine, the gas turbine installation includes a compressor, a combustion chamber, and a turbine. To cool the turbine, air compressed at the compressor is removed, cooled in at least one cooler flowed through by water, thus generating steam, and introduced into the turbine. At least with the gas turbine installation running, prior to or during the start-up of the water-steam cycle, waste heat, which is contained in the steam generated in the at least one cooler, is used to good effect for pre-heating the installation inside the combined cycle power plant.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.