Query scheduler
US9047124B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 14, 2008 |
| Grant date | Jun 2, 2015 |
| Priority date | — |
| Expiry date | Mar 5, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2209/5021
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A mixed workload management system and associated operating method modify a shortest job first (SJF) by service levels. The workload management system comprises a scheduler configured for scheduling mixed workloads. The scheduler comprises an analyzer that determines query execution time, assigns scheduling priority to a query in order inverse to the query execution time, weights the assigned scheduling priority by service level of the query, and sorts a list of queries in order of weighted scheduling priority. A schedule controller selects a query for execution from head of the sorted list of queries.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.