Patent · US Active

Dynamic reservoir engineering

US9074454B2 · kind B2 · utility

2Cited by
40References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 8, 2009
Grant dateJul 7, 2015
Priority date
Expiry dateMar 31, 2033

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B49/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

An example method for performing reservoir engineering includes generating a geological model of a reservoir including a geological horizon, obtaining an offset relative to the geological horizon, and positioning a wellbore equipment item in a well completion design based on the offset. The method further includes calculating an absolute position of the wellbore equipment item in the well completion design based on the offset and a location of the geological horizon in the geological model and updating the geological model to generate an updated location of the geological horizon. The method further includes updating the absolute position of the wellbore equipment item in the well completion design based on the offset and the updated location of the geological horizon and simulating a simulation case including the geological model and the well completion design after updating the absolute position of the wellbore equipment item.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.