Method of operating a wind power plant

US9097236B2 · kind B2 · utility

17Cited by
4References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 2, 2011
Grant dateAug 4, 2015
Priority date
Expiry dateApr 5, 2032

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S10/50
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

Method of operating a wind power plant including the steps of: operating the wind power plant at an current parameter schedule (Pcurrent(v)) performing a wind prediction of wind data (Vw) for a time frame (ΔT) extending to a future time T, determining a desired fatigue load level (Fdesired) of a wind power plant component at the future time T, and during operation of said wind power plant generating an updated parameter schedule (Pdesired(v)) to provide the desired fatigue load level (Fdesired) at time T if exposed to the predicted wind conditions (Vw(t)) during said time frame (ΔT).

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.