Patent · US Active

Bi-directional communication between change management tool and implementation tools

US9152413B2 · kind B2 · utility

1Cited by
7References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 6, 2014
Grant dateOct 6, 2015
Priority date
Expiry dateNov 6, 2034

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F8/70
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Task implementation tools are registered to interface with a change management tool. The change management tool configures a plurality of tasks to implement a change to an information technology infrastructure's configuration, and sends a plurality of task instructions to the plurality of task implementation tools for performing the plurality of tasks. Each task instruction is directed to a targeted task implementation tool for performing a particular task and includes task-related information for the targeted implementation tool to perform the particular task. Registering the plurality of task implementation tools to interface with the change management tool includes registering each the plurality of task implementation tools to accept the task instruction for the particular task directed to it from the change management tool, to know what to do with the task instruction and to know how to respond to the task instruction.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.