Patent · US Active

Continuous optimization of archive management scheduling by use of integrated content-resource analytic model

US9158581B2 · kind B2 · utility

1Cited by
5References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 8, 2013
Grant dateOct 13, 2015
Priority date
Expiry dateApr 4, 2034

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F11/1402
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method and associated system for continuously optimizing data archive management scheduling. A flow network is modeled. The flow network represents data content, software programs, physical devices, and communication capacity of the archive management system in various levels of vertices such that an optimal path in the flow network from a task of at least one archive management task to a worker program of the archive management system represents an optimal initial schedule for the worker program to perform the task.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.