System and method for performing oilfield production operations
US9175547B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 4, 2008 |
| Grant date | Nov 3, 2015 |
| Priority date | — |
| Expiry date | May 12, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06316
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
The invention relates to a method of performing production operations of an oilfield having at least one process facility and at least one wellsite operatively connected thereto, each at least one wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir therein. The method steps include receiving a number of steps each from at least one of a number of collaborators, specifying an automated workflow including the number of steps and for generating a first well plan, obtaining first data associated with the production operations, applying the automated workflow to the first data to generate the first well plan, adjusting the production operations based on the first well plan, and modifying at least one of the number of steps based on input from at least one of the number of collaborators to generate an updated automated workflow.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.