System and method for controlling flow through a sand screen
US9187987B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 8, 2012 |
| Grant date | Nov 17, 2015 |
| Priority date | — |
| Expiry date | Feb 21, 2033 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/12
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A system and methodology utilizes a technique for filtering sand; distributing a flow of fluid; e.g. distributing an inflow of gas or condensate; and limiting the potential for erosion of completion components in a wellbore. The technique may be useful in production applications, but the technique also can be used in fluid injection applications, e.g. gas injection applications. The technique employs a base pipe and a sand screen surrounding the base pipe. The base pipe comprises a plurality of flow restriction openings of reduced size and deployed in a selected pattern along the base pipe. The size and arrangement of the flow restriction openings reduces the peak flux of radial fluid flow through the sand screen to a rate less than a sand screen erosion rate.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.