Method and system of sand management
US9194217B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 26, 2010 |
| Grant date | Nov 24, 2015 |
| Priority date | — |
| Expiry date | Oct 15, 2032 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/14
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A technique facilitates sand control in a wellbore. A lower completion and an upper completion are run downhole into the wellbore and deployed. The lower completion assembly employs a plurality of packers to isolate well zones. The lower completion assembly also has gravel pack ports which are independently opened to enable gravel packing of each individual zone via a tool run downhole. Additionally, the lower completion assembly has a production port in each zone. A shifting tool is employed to open the production ports and to enable production from the well zones.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.