Patent · US Active

Recovery Maturity Model (RMM) for readiness-based control of disaster recovery testing

US9208006B2 · kind B2 · utility

5Cited by
9References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 11, 2013
Grant dateDec 8, 2015
Priority date
Expiry dateSep 4, 2033

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F11/008
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A Recovery Maturity Model (RMM) is used to determine whether a particular Information Technology (IT) production environment can be expected, with some level of confidence, to successfully execute a test for disaster recovery (DR). The RMM provides a quantitative analysis in terms of the extent to which best practices are seen to have been implemented as a set of categories for elements of the environment and multiple elements for each category. A summation of the scoring elements, which may be a weighted summation, results in an overall quantitative metric which is then used to control whether or not testing will proceed.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.