Patent · US Active

Systems and methods for performing scheduling for a cluster

US9229774B1 · kind B1 · utility

9Cited by
0References
10Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 7, 2013
Grant dateJan 5, 2016
Priority date
Expiry dateJan 15, 2034

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5027
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Multiple scheduler verticals can allocate tasks to resources that are shared by the scheduler verticals. Information regarding a state of each resource may be stored in memory accessible by the multiple scheduler verticals, and a processor updates the information. The scheduler verticals schedule events to be performed by any of the resources, and submit updates to reflect the scheduled events in the information. In the event of conflicting events, an update corresponding to only one of the conflicting events is committed. Moreover, disruptions may be preplanned and scheduled so as to minimize impact on scheduled tasks.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.