Composite joist floor system
US9243404B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 16, 2014 |
| Grant date | Jan 26, 2016 |
| Priority date | — |
| Expiry date | Sep 16, 2034 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE04C2003/0491
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Embodiments of the present invention provide systems for connecting a flooring system to a vertical wall. In one embodiment the building structure includes a floor comprising a cementitious slab and a wall supporting at least a portion of the cementitious slab. A plurality of stand-off fasteners extend from the top of the wall into the cementitious slab and are configured to transfer forces between the cementitious slab and the wall. The stand-off fasteners comprise a lower portion and an upper stand-off portion. The lower portion is operatively coupled to the top of the wall, and the upper stand-off portion extends above the top of the wall and is encapsulated within the cementitious slab. In some embodiments, at least a portion of the lower portion is heat treated to a higher degree of hardness relative to the remainder of the stand-off screw.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.