Patent · US Active

Managed pressure cementing

US9249646B2 · kind B2 · utility

23Cited by
41References
25Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 14, 2012
Grant dateFeb 2, 2016
Priority date
Expiry dateJun 1, 2034

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/001
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of cementing a tubular string in a wellbore includes: deploying the tubular string into the wellbore; pumping cement slurry into the tubular string; launching a cementing plug after pumping the cement slurry; propelling the cementing plug through the tubular string, thereby pumping the cement slurry through the tubular string and into an annulus formed between the tubular string and the wellbore; and controlling flow of fluid displaced from the wellbore by the cement slurry to control pressure of the annulus.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.