Optimizing energy use in a data center by workload scheduling and management
US9250962B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 10, 2011 |
| Grant date | Feb 2, 2016 |
| Priority date | — |
| Expiry date | Apr 23, 2033 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D10/00
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Techniques are described for scheduling received tasks in a data center in a manner that accounts for operating costs of the data center. Embodiments of the invention generally include comparing cost-saving methods of scheduling a task to the operating parameters of completing a task—e.g., a maximum amount of time allotted to complete a task. If the task can be scheduled to reduce operating costs (e.g., rescheduled to a time when power is cheaper) and still be performed within the operating parameters, then that cost-saving method is used to create a workload plan to implement the task. In another embodiment, several cost-saving methods are compared to determine the most profitable.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.