Demand control ventilation system with commissioning and checkout sequence control
US9255720B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 1, 2010 |
| Grant date | Feb 9, 2016 |
| Priority date | — |
| Expiry date | Dec 22, 2032 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02B30/56
- WIPO fieldThermal processes and apparatus
- WIPO sectorMechanical engineering
Abstract
The disclosure relates to a Demand Control Ventilation (DCV) and/or Economizer system that is capable of drawing outside air into an HVAC air stream. In some instances, the DCV and/or Economizer system may be configured to help perform one or more system checks to help verify that the system is functioning properly. In some instances, the DCV and/or Economizer system may provide some level of manual control over certain hardware (e.g. dampers) to help commission the system. The DCV and/or Economizer system may store one or more settings and or parameters used during the commissioning process (either in the factory or in the field), so that these settings and/or parameters may be later accessed to verify that the DCV and/or Economizer system was commissioned and commissioned properly.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.