Prediction of impact of workload migration
US9274918B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 25, 2013 |
| Grant date | Mar 1, 2016 |
| Priority date | — |
| Expiry date | Jul 16, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3466
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method, system and product for predicting impact of workload migration. The method comprising: obtaining a utilization pattern of a workload that is being executed on a first platform; generating a synthetic workload that is configured to have the utilization pattern when executed on the first platform; executing the synthetic workload on a second platform; and identifying a change in performance between execution of the synthetic workload on the first platform and between execution of the synthetic workload on the second platform in order to provide a prediction of an impact of migrating the workload from the first platform to the second platform.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.