Patent · US Active

Cogeneration unit and wind power joint heating system and scheduling method therefor

US9285789B2 · kind B2 · utility

0Cited by
0References
10Claims
0Family size

Assignees

Inventors

Key dates

Filing dateOct 22, 2012
Grant dateMar 15, 2016
Priority date
Expiry dateNov 24, 2033

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P80/15
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A cogeneration unit and wind power joint heating system and a scheduling method therefor. The joint heating system comprises a coal-fired steam-extraction condensing-steam cogeneration unit (A), a wind turbine generator unit (B), an air conditioner heat pump (108) parallel-connected to the coal-fired steam-extraction condensing-steam cogeneration unit (A) and to the wind turbine generator unit (B) via a power cable network (113), and a hot water heating radiator (110) connected to the coal-fired steam-extraction condensing-steam cogeneration unit (A) via a heating pipe network (114). The joint heating system also comprises an integrated scheduling control device (115), a first remote centralized controller (1121), a second remote centralized controller (1122), and a third remote centralized controller (1123). Heating is provided to a user by the hot water heating radiator (110) and the air conditioner heat pump (108); while electricity is provided jointly by the coal-fired steam-extraction condensing-steam cogeneration unit (A) and the wind turbine generator unit (B). The scheduling method comprises: after detecting over a period of time the state of power supply and the state of p…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.