Data management for top-down risk based audit approach
US9292808B2 · kind B2 · utility
0Cited by
8References
20Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jul 8, 2010 |
| Grant date | Mar 22, 2016 |
| Priority date | — |
| Expiry date | Sep 5, 2033 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q40/12
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Particular embodiments generally relate to providing risk management. In one embodiment, a first risk is linked to an account group assertion in a data structure. A second risk is linked to a control objective in the data structure. Access to the first risk is granted through the account group's assertion. Access to the second risk is granted through the control objective. Risk management is then performed using the accessed first risk and second risk.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.