Formation testing planning and monitoring
US9309731B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 5, 2010 |
| Grant date | Apr 12, 2016 |
| Priority date | — |
| Expiry date | Apr 29, 2033 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B49/086
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
An example method comprises collecting formation temperature data along a wellbore extending into a subterranean formation, determining test operating parameter values, performing a wellbore hydraulic simulation of the response of wellbore fluid conditions to the test operating parameter values and the formation temperature data, determining whether the response of wellbore fluid conditions is indicative of one of a well control and a well stability problem, and initiating a test based on the determination whether the response of wellbore fluid conditions is indicative of one of a well control and a well stability problem.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.