Operation scheduler for a building automation system
US9338238B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 2, 2011 |
| Grant date | May 10, 2016 |
| Priority date | — |
| Expiry date | Jan 18, 2035 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L2012/285
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
A computer-implemented method for managing and controlling multiple automation components coupled via a building automation network. The computer implemented method includes receiving, via the building automation network, a first operational schedule from a first automation device where the first operational schedule is formatted according to a first protocol, receiving, via the building automation network, a second operational schedule from a second automation device where the second operational schedule is formatted according to a second protocol, converting the received second operational schedule from the second protocol to the first protocol, generating a unified schedule that includes the first operational schedule and the converted second operational schedule, and displaying the unified schedule in a user accessible manner.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.