Patent · US Active

Revoking a zero downtime upgrade

US9361093B2 · kind B2 · utility

12Cited by
2References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 1, 2014
Grant dateJun 7, 2016
Priority date
Expiry dateJan 1, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F16/23
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Revocation of a zero downtime upgrade of an upgrade procedure of a source system to a target system is initiated. Thereafter, upgrade activities are stopped at the target system and production activities are stopped at the source system. At least a portion of the target tables can be subsequently dropped and any associated table structure changes can be revoked. At least a portion of the target tables are then switched from use by the target system to use by the source system. Next, the source system is connected to the source database schema to enable use of the source system in its state prior to the initiation of the upgrade procedure. Related apparatus, systems, techniques and articles are also described.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.