Job scheduling management
US9389916B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 22, 2015 |
| Grant date | Jul 12, 2016 |
| Priority date | — |
| Expiry date | Dec 22, 2035 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3419
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Resource utilization data for a set of system components of a computing system is collected. The resource utilization data includes performance records for a set of jobs. By analyzing the collected resource utilization data for the set of system components, a resource allocation is identified for a particular job of the set of jobs. A first execution time for the particular job is determined based on the resource allocation for the particular job and the resource utilization data for the set of system components. A location at which to execute the particular job is determined based on how the particular job has been executed at the location previously. The first execution time may be a time when the computer system achieves a resource availability threshold with respect to the resource allocation. Aspects are also directed toward performing the particular job at the first execution time.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.