Estimation of optimum tripping schedules
US9399900B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 23, 2013 |
| Grant date | Jul 26, 2016 |
| Priority date | — |
| Expiry date | Jun 9, 2034 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B49/02
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method for removing a core sample from a borehole includes: taking the core sample within the borehole with a sampling tool; generating a model of the core sample, the model based on data representing properties of the core sample; defining a plurality of proposed tripping schedules; applying, by a processor, the plurality of proposed tripping schedules to the model, and estimating a core parameter for each of the plurality of proposed tripping schedules; comparing the core parameter to a criteria; and selecting a suitable tripping schedule based on the comparison.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.