Steam power plant with heat reservoir and method for operating a steam power plant
US9399928B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 3, 2012 |
| Grant date | Jul 26, 2016 |
| Priority date | — |
| Expiry date | Nov 3, 2032 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E60/14
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
A steam power plant is suggested having, parallel to the low-pressure passage (VW1 to VW2), a heat reservoir (A) which is loaded with preheated condensate in weak-load times. This preheated condensate is taken from the heat reservoir (A) for generating peak-load and inserted downstream of the low-pressure preheater passage (VW1 to VW2) into the condensate line that contacts the feed water container (8). Thus it is possible to quickly control the power generation of the power plant in a wide range without significantly having to change the heating output of the boiler of the steam generator (1). A steam power plant equipped according to the invention can thus be operated with bigger load modifications and also provide more control energy.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.