Patent · US Active

Energy efficient job scheduling in heterogeneous chip multiprocessors based on dynamic program behavior using prim model

US9436512B2 · kind B2 · utility

3Cited by
5References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 20, 2012
Grant dateSep 6, 2016
Priority date
Expiry dateDec 26, 2033

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Methods for efficient job scheduling in a heterogeneous chip multiprocessor that include logic comparisons of performance metrics to determine if programs should be moved from an advanced core to a simple core or vice versa.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.