Converter station power set point analysis system and method
US9450409B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 20, 2013 |
| Grant date | Sep 20, 2016 |
| Priority date | — |
| Expiry date | Jul 16, 2034 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S20/222
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
Converter stations have real and reactive power set points initially determined as part of a main loadflow analysis routinely performed on the AC power system connected to the converter stations. Viable real and/or reactive power set points for the converter stations can be identified by calculating real and/or reactive power set point candidates for the converter stations before the main loadflow analysis is performed again on the AC power system. The power set point candidates are calculated based on information determined as part of a previous iteration of the main loadflow analysis on the AC power system. The power set point candidates which violate an operating constraint imposed on the AC power system are identified, and a region of valid power set points is defined for the converter stations that excludes the power set point candidates which violate an operating constraint imposed on the AC power system.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.