Load condition based transfer of processing responsibility
US9450880B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 13, 2015 |
| Grant date | Sep 20, 2016 |
| Priority date | — |
| Expiry date | Oct 13, 2035 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L69/22
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
According to one embodiment, a method comprises an operation of determining whether an ingress control message is locally terminated control traffic on a digital device prior to the ingress control message being forwarded to a hardware processor of the digital device for processing. A priority is assigned to the ingress control message based on information within the ingress control message, if the ingress control message is determined to be locally terminated control logic.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.