Patent · US Active

High efficiency, high pressure gas turbine engine fuel supply system

US9453463B2 · kind B2 · utility

5Cited by
10References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 14, 2013
Grant dateSep 27, 2016
Priority date
Expiry dateOct 26, 2034

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF02C7/236
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A gas turbine engine fuel supply system includes a primary gear pump and a secondary gear pump. The primary gear pump always actively delivers fuel to the downstream fuel system, and is sized to supply 100% of the burn flow needed at a select low demand condition. The secondary gear pump is sized to make up the remainder of the flow at high demand conditions, and actively delivers fuel to the downstream fuel system only during those conditions. To supply discharge fuel pressures in excess of gear pump capability, a supercharger pump is disposed upstream of the primary and secondary gear pumps. The supercharger pump is preferably activated only during high demand conditions as an additional energy conservation measure.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.