Systems and methods for production of gas wells
US9470076B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 23, 2014 |
| Grant date | Oct 18, 2016 |
| Priority date | — |
| Expiry date | Aug 11, 2034 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/13
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method for producing gas from a well including a wellbore extending from a surface into a subterranean formation, wherein the well also produces liquid, the method including: (a) producing gas from a production zone in the subterranean formation through an annulus extending within the wellbore at a first velocity that is greater than a critical velocity, and (b) pumping liquid through a liquid tubing string after (a) to reduce a level of the liquid within the wellbore. The method also includes: (c) shutting in the annulus after (a) after the first velocity decreases below the critical velocity, wherein the annulus has a first cross-sectional area and the first production string has a second cross-sectional area that is less than the first cross-sectional area, and (d) producing gas from the production zone through the first production tubing string after (c) at a second velocity being greater than the critical velocity.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.