Patent · US Active

Allocating resources to tasks in a build process

US9471386B2 · kind B2 · utility

0Cited by
3References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 27, 2014
Grant dateOct 18, 2016
Priority date
Expiry dateAug 29, 2034

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5027
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Allocating resources for tasks in a build process is provided. The build process includes a plurality of tasks. Task metadata is obtained. The task metadata comprising a task type of a second task in the plurality of tasks. Execution metadata is obtained. The execution metadata comprising an execution result of a first task in the plurality of tasks. The second task depends on the execution result of the first task. A resource required by the second task is determined according to the task metadata and the execution metadata.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.