Inclined layered solid-filling mining method in ultrathick coal layer
US9494037B2 · kind B2 · utility
2Cited by
1References
5Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jan 22, 2014 |
| Grant date | Nov 15, 2016 |
| Priority date | — |
| Expiry date | Jan 22, 2034 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21D23/0481
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
In an inclined layered solid-filling mining method in an ultrathick coal layer, tunnels and equipment are arranged according to a solid-filling mining method. An artificial roof for a lower layer is formed by metal meshes and bamboo fences of a first layer a solid-filling mining method. The method is repeated, until the entire ultrathick coal layer is finished. The method is repeated forming additional roofs for subsequent layers.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.