Exploring the impact of changing project parameters on the likely delivery date of a project
US9501753B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 12, 2014 |
| Grant date | Nov 22, 2016 |
| Priority date | — |
| Expiry date | Jan 29, 2035 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/0635
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A user may be allowed to specify a change in one or more parameter data associated with the project, the one or more parameter data used previously to compute a probability distribution of completion time of the project. The probability distribution of completion time of the project may be recomputed based on the change. The recomputed probability distribution of the completion time of the project may be presented. An option to save the recomputed probability distribution may be provided. An option may be provided to specify another change in one or more parameter data associated with the project and repeat the recomputing and the presenting procedures based on another change in one or more parameter data associated with the project.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.