Patent · US Active

Cluster creation and management for workload recovery

US9507676B2 · kind B2 · utility

3Cited by
3References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 17, 2014
Grant dateNov 29, 2016
Priority date
Expiry dateJun 1, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2201/86
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Aspects of the disclosure relate to managing migration of one or more applications from a primary computing device to recovery computing devices using a controller. Resource data that includes application resource requirements and resource capacities is monitored. An application exists as a single instance on the primary computing device. A recovery cluster for the application consisting of recovery computing devices is determined. A division of the application into a plurality of application instances is identified. In response to the resource data being updated, a new recovery cluster is determined. In response to the new recovery cluster, a new plurality of application instances is identified. Once a triggering event on the primary computing device is detected, the controller migrates the new application instances to the new recovery cluster. Other uses of the disclosure are possible.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.