Grid optimization resource dispatch scheduling

US9523967B2 · kind B2 · utility

0Cited by
3References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 14, 2014
Grant dateDec 20, 2016
Priority date
Expiry dateMar 24, 2034

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S10/50
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Data comprising a request specifying a desired change in electrical load for a defined period of time is received. The electrical load is associated with a plurality of resources under control of resource agents and on a utility grid. Available capacity of resources within the control of each resource agent over the defined period of time is determined. Each available capacity is determined at least using a resource load model. Using the determined available capacity of resources over the defined period of time, resource scheduling instructions are calculated for a subset of resources. The resource scheduling instructions satisfy the desired change in electrical load of the request. Data characterizing the resource scheduling instructions is provided. Related systems, apparatus, methods, and articles are also described.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.