Patent · US Active

Systems and methods for managing hydrocarbon material producing wellsites using clamp-on flow meters

US9528362B2 · kind B2 · utility

0Cited by
11References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 16, 2013
Grant dateDec 27, 2016
Priority date
Expiry dateMar 13, 2035

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/10
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method and system for managing one or more hydrocarbon producing well sites is provided. The well site includes a hydrocarbon material flow passing through a pipe. The system includes a clamp-on flow meter and a control station. The clamp-on flow meter is operable to produce output indicative of at least one characteristic of the hydrocarbon material flowing through the pipe at the well site. The control station is separately located from the well site. The control station includes at least one processor adapted to receive the output from the clamp-on flow meter. The processor is adapted to determine one or more characteristics of the hydrocarbon material flow at each well site using a flow compositional model.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.