Methods for managing work load bursts and devices thereof
US9535749B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 10, 2013 |
| Grant date | Jan 3, 2017 |
| Priority date | — |
| Expiry date | Mar 16, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/5083
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method, non-transitory computer readable medium, and resource management computing device comprises identifying one or more workload bursts in a production environment. One or more additional resources in a non-production environment required to manage the one or more workload burst in a production environment is determined by comparing an environment resource consumption value against a permissible maximum value, wherein the environment resource consumption value is a value indicating usage of each of the one or more resources. One or more additional resources are identified in the non-production environment. The identified one or more additional resources are provided to handle the one or more workload bursts.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.