Patent · US Active

Methods for managing work load bursts and devices thereof

US9535749B2 · kind B2 · utility

1Cited by
3References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 10, 2013
Grant dateJan 3, 2017
Priority date
Expiry dateMar 16, 2034

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5083
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method, non-transitory computer readable medium, and resource management computing device comprises identifying one or more workload bursts in a production environment. One or more additional resources in a non-production environment required to manage the one or more workload burst in a production environment is determined by comparing an environment resource consumption value against a permissible maximum value, wherein the environment resource consumption value is a value indicating usage of each of the one or more resources. One or more additional resources are identified in the non-production environment. The identified one or more additional resources are provided to handle the one or more workload bursts.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.