Patent · US Active

Scheduling jobs in a cluster by constructing multiple subclusters based on entry and exit rules

US9542223B2 · kind B2 · utility

0Cited by
7References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 13, 2014
Grant dateJan 10, 2017
Priority date
Expiry dateMay 8, 2034

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L67/1001
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Jobs are scheduled in a cluster comprising multiple computing nodes. The scheduling of jobs includes defining rules for constructing virtual sub-clusters of the multiple computing nodes. The multiple nodes in the cluster can be placed into multiple virtual sub-clusters based on the rules, wherein one computing node can only be included in one virtual sub-cluster. A job is received and dispatched to a selected virtual sub-cluster. At least one computer node is scheduled for the dispatched job in the selected virtual sub-cluster. Further, the job is dispatched to the selected virtual sub-cluster based on characteristics of the job and/or characteristics of virtual sub-clusters.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.