Method for retrofitting a gas turbine power plant
US9550261B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 12, 2012 |
| Grant date | Jan 24, 2017 |
| Priority date | — |
| Expiry date | Jul 23, 2033 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY10T29/49229
- WIPO fieldEnvironmental technology
- WIPO sectorChemistry
Abstract
A method for retrofitting an already existing gas turbine power plant is provided. The method features at least the following steps: fluidically connecting a gas turbine to a flue gas duct which is suitable for conducting flue gas which is produced by the gas turbine; connecting the flue gas duct to a steam generating unit which is fluidically connected to a water-steam cycle, and via which water-steam cycle a power generating facility can be operated; fluidically connecting a CO2 separation apparatus to the flue gas duct for separating the CO2 from the flue gas in the flue gas duct; and electrically connecting the power generating facility to the CO2 separation apparatus, preferably for the essentially energy-autonomous operation of the CO2 separation apparatus.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.