Patent · US Active

Method for operating a power plant installation

US9574462B2 · kind B2 · utility

0Cited by
10References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 27, 2013
Grant dateFeb 21, 2017
Priority date
Expiry dateSep 8, 2033

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF01K13/02
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

The invention relates to a method for operating a power plant, wherein in partial load operation the increase of temperature results at the outlet of the high-pressure turbine section as a consequence of a throttling by means of the intermediate pressure valve.