Patent · US Active

Nuclear reactor core loading and operation strategies

US9583223B2 · kind B2 · utility

1Cited by
7References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 23, 2012
Grant dateFeb 28, 2017
Priority date
Expiry dateSep 25, 2035

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E30/30
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

Cores include different types of control cells in different numbers and positions. A periphery of the core just inside the perimeter may have higher reactivity fuel in outer control cells, and lower reactivity cells may be placed in an inner core inside the inner ring. Cores can include about half fresh fuel positioned in higher proportions in the inner ring and away from inner control cells. Cores are compatible with multiple core control cell setups, including BWRs, ESBWRs, ABWRs, etc. Cores can be loaded during conventional outages. Cores can be operated with control elements in only the inner ring control cells for reactivity adjustment. Control elements in outer control cells need be moved only at sequence exchanges. Near end of cycle, reactivity in the core may be controlled with inner control cells alone, and control elements in outer control cells can be fully withdrawn.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.