Patent · US Active

Resource-based scheduler

US9588809B2 · kind B2 · utility

0Cited by
28References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 10, 2006
Grant dateMar 7, 2017
Priority date
Expiry dateJul 27, 2029

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/485
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Resource-based scheduling of computer jobs is disclosed. A computer job is scheduled based on utilization of a resource and a utilization criterion that the computer job has pertaining to the resource, in accordance with an embodiment of the present invention.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.