Resource-based scheduler
US9588809B2 · kind B2 · utility
0Cited by
28References
15Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Oct 10, 2006 |
| Grant date | Mar 7, 2017 |
| Priority date | — |
| Expiry date | Jul 27, 2029 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2209/485
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Resource-based scheduling of computer jobs is disclosed. A computer job is scheduled based on utilization of a resource and a utilization criterion that the computer job has pertaining to the resource, in accordance with an embodiment of the present invention.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.