Over-rating control of wind turbines and power plants
US9599096B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 30, 2011 |
| Grant date | Mar 21, 2017 |
| Priority date | — |
| Expiry date | Oct 27, 2032 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E10/72
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
A wind turbine power plant comprises a plurality of wind turbines, each having a rated output and under the control of a power plant controller. The power plant also has a rated output which may be over-rated in response to one or more electricity pricing data, power plant age and operator demand. This may comprise a schedule of output set point changes which effect seasonal or intraday changes in electricity prices or which reflect aging of the power plant. It may also reflect the price of electricity on spot or futures markets. Once the over-rating of the power plant has been set, the output may be increased by over-rating individual turbines or operating turbines at rated power if the sum of the rated outputs of the turbines exceeds or is equal to the new power plant output set point.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.