Datacenter and cooling control fault-tolerance using compute resources

US9603282B2 · kind B2 · utility

1Cited by
6References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 3, 2014
Grant dateMar 21, 2017
Priority date
Expiry dateApr 30, 2035

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Management of infrastructure devices is performed by computing devices that are associated with the processing being provided by the data center, such as chassis managers. A master is first selected through polling or consensus algorithms, and then subsequently the master is endowed with the authority to manage infrastructure devices and generate the control output to such infrastructure devices. Alternatively, no master need be elected and, instead, output to such infrastructure devices is generated by a computing device selected utilizing polling or consensus algorithms, and in accordance with a management decision made through polling or consensus algorithms. The interplay between the cooling apparatuses of individual server computing devices and the cooling apparatuses of the data center as a whole is also managed to increase the portion of the cooling of server computing devices provided by data center air movers. Control of data center air movers can be determined empirically or predictively.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.