Patent · US Active

Early verification of a production well

US9638024B2 · kind B2 · utility

2Cited by
3References
12Claims
0Family size

Assignee

Inventor

Key dates

Filing dateJun 22, 2012
Grant dateMay 2, 2017
Priority date
Expiry dateApr 15, 2034

Classification

  • Technology area (CPC C)Chemistry; Metallurgy
  • CPC primaryC09K8/52
  • WIPO fieldBasic materials chemistry
  • WIPO sectorChemistry

Abstract

A method for a rapid verification of satisfactory clean-up at the end of the completion process when starting production of petroleum fluids while the completion rig is still at the well. The method includes marking one or more of separated zones along the well by one or more distinct tracers, before starting production. The tracers are added along with the completion or the clean-up fluid, and the tracers are arranged to be released by relative high concentrations from each zone to an inflowing fluid of oil or gas.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.