Early verification of a production well
US9638024B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Jun 22, 2012 |
| Grant date | May 2, 2017 |
| Priority date | — |
| Expiry date | Apr 15, 2034 |
Classification
- Technology area (CPC C)Chemistry; Metallurgy
- CPC primaryC09K8/52
- WIPO fieldBasic materials chemistry
- WIPO sectorChemistry
Abstract
A method for a rapid verification of satisfactory clean-up at the end of the completion process when starting production of petroleum fluids while the completion rig is still at the well. The method includes marking one or more of separated zones along the well by one or more distinct tracers, before starting production. The tracers are added along with the completion or the clean-up fluid, and the tracers are arranged to be released by relative high concentrations from each zone to an inflowing fluid of oil or gas.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.