Grid-friendly data center
US9691112B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | May 31, 2013 |
| Grant date | Jun 27, 2017 |
| Priority date | — |
| Expiry date | Jan 8, 2036 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q30/0202
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Methods and arrangements for calculating a power budget. Data are received, the data including data relating to a current state of an electrical grid at a power-drawing location which draws at least one variable electrical load, the at least one variable electrical load being subject to variable pricing. At least one prediction is determined, the at least one prediction pertaining to a future state of the electrical grid and a future electrical load to be drawn at the power-drawing location. A power budget is thereupon calculated, with respect to the power-drawing location, based on the data and the at least one prediction. Other variants and embodiments are broadly contemplated herein.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.