Workflow for migration planning of data storage systems
US9710308B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 24, 2013 |
| Grant date | Jul 18, 2017 |
| Priority date | — |
| Expiry date | Jan 31, 2036 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Techniques for improved workflow for migration planning of data storage systems. For example, a method comprises the following steps. A plurality of elements representing events of a workflow are generated, wherein each element is active for a predetermined duration. A group of one or more assets to be migrated as a unit are assigned to each element. A group of the one or more assets is moved from a first element of the plurality of elements to a second element of the plurality of elements.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.