Patent · US Active

Data construction for extract, transform and load operations for a database

US9710529B2 · kind B2 · utility

3Cited by
2References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 6, 2014
Grant dateJul 18, 2017
Priority date
Expiry dateOct 2, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F16/2365
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

An extract, transform and load (ETL) data construction system provides an extensible, interim platform for transitioning data from a legacy database or other data sources to a target database. The data construction system performs data construction operations which may include creating data that can be used for data transformation in ETL operations. The data construction system provides check-in-check-out procedures for controlling multi-user data access and data editing, and also provides multi-level user access checks.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.