Patent · US Active

Building of computing system in accordance with predictive build based on marginal cost acceptablity

US9710838B2 · kind B2 · utility

1Cited by
2References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 30, 2013
Grant dateJul 18, 2017
Priority date
Expiry dateSep 16, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q30/0635
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Features to include within a predictive build of a computing system are selected. The predictive build is an anticipated final build of the computing system prior to receiving a firm customer order for the computing system in accordance with which an actual final build of the computing system is then built. A marginal cost of first building the predictive build and then modifying the predictive build to realize the actual final build, as compared to building the actual final build without first building the predictive build and then modifying predictive build to realize the actual final build, is estimated based on the features selected. Responsive to determining that the marginal cost is less than a predetermined acceptable marginal cost limit, the predictive build is built prior to receiving the firm customer order, and then is modified to realize the actual final build upon receiving the firm customer order.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.